Skip to content Skip to footer

How Long Does Kitchen Cabinet Installation Really Take?

You have already picked the cabinets, imagined the colors, and planned the layout for the new kitchen cabinet installation in Marietta. But now the big question hits: how long will it actually take to get those cabinets installed?

The fact is, it varies from kitchen to kitchen, design to design, and from wall to wall. But if you want a realistic idea, here’s what usually happens when our team of kitchen cabinet contractors in Atlanta takes charge.

Why Some Installations Take Longer Than Others

See, the time kitchen cabinet installers take in Atlanta depends on various factors: 

  • Kitchen size matters. A tiny galley kitchen? Probably done in a day or two. A large open kitchen with an island? Plan for several days.
  • Custom cabinets take patience. Ready-made cabinets take less time to install. Custom kitchen cabinets in Marietta? They need trimming, adjustments, and perfect alignment.
  • Old walls and floors. Uneven surfaces would slow things down; our kitchen cabinet installation company in Buckhead has to fix them first so your cabinets fit perfectly.
  • The little details. Crown molding, soft-close drawers, hidden storage; they make a kitchen amazing, but they also add time.

The key is having a team that knows how to handle all this without making it stressful. That’s where our affordable kitchen cabinet replacement in Buckhead really shines. 

How Long Does It Usually Take?

Here’s a rough guide for most kitchens:

Kitchen TypeInstallation Time
Small or partial replacement1–2 days
Standard full kitchen2–4 days
Large or custom kitchen4–7 days

These are installation days only. Measurement, design approval, and cabinet delivery happen before work even starts. But once yomur custom wood cabinet installation service providers arrives, you’ll see your kitchen take shape fast.

What Happens Each Day

Here’s a process of affordable and luxury kitchen cabinet installation in Buckhead in brief: 

  • Day 1 – Prep & demolition: It’s time to bring out the old cabinets, and the space gets cleared and well-prepared for further processing.
  • Day 2–3 – Cabinets go in: Base and upper cabinets are installed, leveled, and anchored. Every drawer, every door is checked for perfect alignment.
  • Day 4 – Finishing touches: Trim, molding, hardware, and soft-close mechanisms go in. Everything is polished and ready for use.
  • Final walkthrough: You inspect, test every drawer and door, and walk into your brand-new kitchen for the first time.

By the end of the week, your kitchen feels completely different; sleek, functional, and ready to enjoy.

Why Professionals Make a Difference

Installing custom wood cabinets might look easy, but just one misalignment and your whole kitchen in Atlanta can feel off. Our kitchen cabinet installers know how to:

  • Level cabinets on uneven floors
  • Fit custom pieces perfectly
  • Handle surprises without delays

With our skilled kitchen cabinet installation company in Buckhead, your kitchen goes from a dream to reality smoothly, quickly, and beautifully.

How to Keep Your Project on Track

You can help speed things along, too:

  • Approve designs and measurements quickly
  • Clear out your kitchen before installation
  • Communicate any changes early

Even small steps like these make a big difference.

The Bottom Line

Most kitchens in Atlanta, Marietta, and nearby areas are ready in 2–4 days once the installation begins. Luxury or fully custom wood cabinet installation may take a bit longer, but you’ll always know the plan from day one.

You just need the right team, and that’s what we are. Call Signature Cabinetry & Design today and see how fast your dream kitchen can become reality.

Leave a comment